• Ensure gutter system is clean
and free of debris
• Inspect gutter hangers,
ensuring:
- tightly fastened to fascia
and
attached to gutter
- minimum one hanger every
24 inches
Click here for photo detail |
|
 |
• Install first Diamond Gutter Shield®
at beginning of gutter run
• Measure 2 inches from end of
Shield
• Cut and remove a notch from
front and back edges
• Cut a line 2" long down the
center of rib
• Bend remaining 2 inch flap 90
degrees to create an end cap
• See illustrations #6 and 8 for
details
Click here for photo detail
see cutting instructions below
|
|
| |
|
 |
• Insert Drip Foot (back edge)
of
Shield onto gutter hangers
• Ensure Drip Foot engages
fully,
sitting snug to back of
gutter
Click here for photo detail |
|
 |
• Lower the face of Shield
onto the top of the gutter
• Shield should be
approximately 1/4" longer
than inside face of gutter
• See circled portion of
illustration #4
Click here for photo detail |
|
| |
|
 |
• Flex the Shield slightly inward
and engage front edge of
Shield inside gutter lip
• The flex will create a snug
Pressure Fit with gutter lip
• *Option for high wind areas -
add 1/4" galvanized screw
through punched holes
Click here for photo detail |
|
 |
• When installing each additional
section, be sure to overlap the
notched areas completely with
previous section
• Overlapping each Shield
section keeps debris out and
adds support to the completed
Shield system
Click here for photo detail |
|
| |
|
 |
• Gutter system corners require
a
butted mitre joint
• Measure from back corner of
gutter system to ensure correct
length
• Cut a 45 degree angle from the
Drip Foot (back of Shield) to
the Drip Lip (front of Shield),
careful not to distort the profile
of the Shield
Click here for photo detail
(Corner Cut Instructions)
|
|
 |
• At the termination end of the
Shield system, you will need to
cut and remove a 2 inch section
of the Shield's face (as in #2)
• Cut a line 2" long down the
center of rib as shown.
Bend these 2 inch sections
downward at a 90 degree angle
as shown to overlap and create
a cap to the end of the system
Click here for photo detail
see cutting instructions below
|
|
|
STEP #1: When cutting Shield sections, start from Drip Foot (back) and cut towards the hook area. Stop cutting before the hook.
Click here for photo detail
|
STEP #2: Begin second cut on Drip Lip (front edge). Stop cutting when you reach hook area.
Click here for photo detail |
STEP #3: Hook area is now the only attached portion. Gently bend this portion back and forth until section separates. This method ensures the hook area maintains its profile and proper function.
Click here for photo detail |
*Areas which fall within 50 miles of the coastline are required to use fasteners attached into the Shield's Drip Lip to engage
the top of the gutter (as shown in #5 above). Pressure Fit Technology testing has passed independent testing over 75 MPH, or a Low Velocity
Hurricane Rating only. |
|
|